|
|
|||||||
|
Total time to strip a mech down to its components was IIRC published in BattleTech RPG 1st Edition... humm, be interesting if someone would build a sheet that digested a HMP text Output and turned the loadout's Crits, Armour Pips, and IS Pips, and to the total amount of time necessary to build it by "hand"*... Nothing in the Canon tells us how much a force multiplier a real factory setup will be... * (using the Repair Platform, (Armour) Cutting / Joining Kit, Gyro Kit, Fusion Engine Repair Kit, Sensor Repair Kit, Electronics Repair Kit, etc. (IOW, the BattleTech Rules assume that you have *all* this Equipment... The Mechwarrior / BattleTech RPG Rules allow for the possibility that you DON'T) |