Coventry Metal Works Refit Facility
Overview
The Coventry Metal Works Refit Facility was established during the Jihad during the fight to liberate Coventry. Originally nothing more than a warehouse facility for Coventry Metal Works, several engineers relocated to the facility and began performing repair work on damaged LCAF units. Over the course of the Jihad the facility became more capable, eventually being able to assemble and repair light 'Mechs used by the local militia.
After Coventry was liberated from the Word of Blake, the facility remained active and continued to repair militia units and perform some light assembly while the main Coventry Metal Works lines were repaired.[1]
Manufacturing
Coventry Metal Works has manufacturing centers on the following planets:
Coventry
Components produced on Coventry:[1] | |
---|---|
Component | Type |
Mechs | |
STG-3R Stinger[1] | Light BattleMech |
SCB-9A Scarabus[1] | Light BattleMech |