Difference between revisions of "2675"

m (fix)
m (tag repair)
Line 4: Line 4:
  
  
*[[Swift (Aerospace Fighter)]] schedule introduction into service, but it delays keep it from entering service.<ref>''[[Technical Readout: 2750]] page 60 - Overview</ref>
+
*The [[Swift (Aerospace Fighter)|''Swift'']] [[AeroSpace Fighter]] scheduled introduction into service, only to be delayed due to teething issues.<ref>''[[Technical Readout: 2750]] page 60 - Overview</ref>
*[[Orgus Industries]] introduce the ''[[Urbanmech]]'' [[BattleMech]].<ref>''[[Technical Readout: 3039]] pg.108''</ref>
+
*[[Orguss Industries]] introduce the ''[[Urbanmech]]'' [[BattleMech]].<ref>''[[Technical Readout: 3039]] pg.108''</ref>
  
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 23:58, 31 January 2010

Find all references to year 2675 - One link per entry (See Years Policy)



References

  1. Handbook: House Steiner pg.96 Profile of Lyran Leaderships
  2. Technical Readout: 2750 page 60 - Overview
  3. Technical Readout: 3039 pg.108